Construction time:
8 months
date
2023

The test well was designed as a comprehensive platform for testing a variety of equipment, including engines, screens, pipes, and probes. A core part of this project was the creation of a 150-meter deep simulation well, drilled to actual specifications. This well was an impressive technical achievement, drilled through 20 meters of sand and 130 meters of solid granite, faithfully replicating conditions encountered in real operations.

Every aspect of this area was meticulously planned to simulate the most challenging field conditions. All equipment was subjected to tests that faithfully replicated real-world field conditions, including closed-loop fluid circulation and physical/chemical monitoring. This ensured that the equipment was tested under representative conditions, providing valuable insights into its performance under pressure.